ApproachYour siteCommunityStandardsTeam Start a conversation →
Our standards

What we commit to, before we ask for anything.

These are design commitments we hold ourselves to on every building we take on. Once a hall is operating, its measured figures are published here in the same place.

CommitmentStandardWhat it means on the ground
Land takenNoneWe work inside an existing building envelope. The footprint does not grow.
CoolingClosed loopCharged once, then recirculated. No ongoing draw on the municipal water supply.
NoiseContainedEquipment is contained inside the shell, not mounted in open yards.
Power drawnAs entitledSized to the service the site already has, not to what we wish it had.
Supplemental generationLow emissionFuel-flexible units where needed, sized to the site and no larger.
Building fabricImprovedRoof, drainage, paving and landscaping brought up to standard as part of the work.
OperationsIn houseOur own staff on site. We are the long-term owner, not a developer passing it on.

Why these are commitments, not measurements

No Junction Halls building is operating yet. Publishing measured performance for a hall that does not exist would be worth nothing to you, so we have not done it.

What we can do is state the standard we intend to be held to, in public, before we ask a landowner or a community for anything. When the first hall is commissioned, its measured performance is published on this page and updated from then on, whether or not it flatters us.

Get in touch

Tell us about the building.

Whether you own it, represent it, or simply live near it, we would rather hear from you early than late.

Introduce a site → Community enquiries